|
|
 |
 |
 |
 |
 |
 |
 |
| Annual convention costs. |
Unavailable. |
| A work wage. |
One hour 8,000 yen (tax-included). |
| Extension rate. |
I follow the above rate. |
| A material cost. |
It is an offer of one surcharge of the stocking. |
| A visit rate. |
One spot 2,500 yen (tax-included). |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
| Annual convention costs. |
15,000 yen (tax-included). |
| A work wage. |
One hour 4,000 yen (tax-included). |
| Extension rate. |
By 10 minutes unit 600 yen (tax-included). |
| A membership benefit. |
| 1. |
I do a work wage free service of the first time by a member procedure. |
| 2. |
A work wage is 4,000 yen of half price. |
| 3. |
When new member is introduced, I pay 5,000 yen cashback. |
| 4. |
Member of annual convention costs assume the second year 25% discount, and since then it is 10% a year discounts. It is discounted to 65% of member of first time costs at the maximum.
|
|
| A material cost. |
It is an offer of one surcharge of the stocking. |
| A visit rate. |
One spot 2,500 yen (tax-included). |
|
 |
 |
 |
 |
|
 |
 |
| ■In the case of H. |
| Drainage of a washroom was jam-packed. |
| A work wage (two hours). |
16,000 yen. |
| A material cost (drainage rubber packing) |
52 yen. |
| A child has broken glass. |
| Work wage (one hour) |
8,000 yen. |
| Extension rate (30 minutes) |
8,000 yen. |
| A material cost (wire figured glass) |
7,750 yen. |
| I want to add a safeguard to stairs of a house. |
| A work wage (one hour) |
8,000 yen. |
| Extension rate. (50 minutes) |
8,000 yen. |
| Material cost (a fall prevention safeguard) |
5,000 yen. |
|
|
| ■In the case of K. |
| Drainage of a washroom was jam-packed. |
| Newly member costs. |
15,000 yen. |
| A material cost (drainage rubber packing) |
52 yen. |
| A child has broken glass. |
| A work wage(one hour) |
4,000 yen. |
| Extension rate(30 minutes) |
1,800 yen. |
| A material cost (wire figured glass) |
7,750 yen. |
| I want to add a safeguard to stairs of a house. |
| A work wage(one hour) |
4,000 yen. |
| Extension rate(50 minutes) |
3,000 yen. |
| Material cost (a fall prevention safeguard) |
5,000 yen. |
|
| 60,802 yen of expenditure in total. |
For balance 20,200 yen with nonmember,
a wallet is better off! |
|
・About a juridical person contract.
When it is a small juridical person, I follow personal contract, but, by the type of job and a scale, need annual convention costs from 50 yen per a 1 cube meter floor space of a contract part to 500 yen. Please refer separately.
|
|
|